Data center rules
- Every rack and piece of equipment has a unique asset ID that follows your scheme, for example
DH1-A-03(hall 1, row A, position 3) - A and B feed fields are filled on every rack and point to equipment that exists in the model, such as the RPPs
RPP-1A-01andRPP-1B-01 - Rack data is filled: U height, design kW, cooling type
- Rack and equipment schedules match what's placed, hall by hall
- Campus copies carry their building prefix, such as
B2-DH1-A-01 - Equipment sits in the hall or room its parameters name