Kentucky · served remotely

Data center BIM and Revit automation for Kentucky projects

Tools, model checks and content for Autodesk® Revit® software, for contractors, engineers and owners building data centers in Kentucky, from Louisville to Paducah. We work with your team remotely.

Served remotely. SS Technologies is a remote company. We have no office in Kentucky and we don't claim Kentucky clients. The projects named on this page are public examples of work in the state. We have no involvement in them.

Kentucky at a glance

Very large campuses, arriving fast.

In January 2026, the Louisville campus was described as the only data center project under construction in the state. By August, a 1.8 GW project had been announced in Paducah and a statewide map showed more than 20 proposals. For design and construction teams, that means big, repetitive buildings and a lot of power equipment, with a limited local workforce.

400 MW

Louisville campus on Camp Ground Road by PowerHouse and Poe Companies, with its first 130 MW of power planned for October 2026. In January 2026 it was described as an $11B project and the only data center in the state under construction.

1.8 GW

hyperscale project planned at the former gaseous diffusion plant site in Paducah: $100B+, about 2 GW of natural gas generation, up to 2.6 GW of batteries and about 8,000 construction jobs. Announced July 29, 2026.

20+ proposals

on a statewide map of data center proposals, including several of 1 GW or more, alongside moratoria in some counties and at least one withdrawn proposal.

Up to 50 years

of sales and use tax exemption, extended statewide by HB 775 in 2025. Minimum investment: $450M in counties of 100,000+ people, $100M in counties of 50,000–100,000, and $25M in counties under 50,000.

Worked example: campus replication

Louisville: seven data center buildings on one campus.

The Louisville campus is planned at about 1.6M sq ft. That total includes office, utility and security buildings, plus seven data center buildings of about 219,534 sq ft each.

Buildings of the same size on one campus are a natural fit for a prototype-and-copy approach. Where buildings share a design, a fix to the prototype has to reach every copy. Without a tool, one change becomes the same edit in seven models, plus re-issued sheets for every building.

Source: DCD, planning commission recommends approval for 1.6M sq ft Louisville data center. The steps below are an illustration of the method, not this project's design or data.

Campus replicationOne prototype building is copied to five more buildings. Each copy gets its own ID prefix, sheets and schedules.Prototype B1fix it once herecopyB2-DH1-A-01…B3-DH1-A-01…B4-DH1-A-01…B5-DH1-A-01…B6-DH1-A-01…IDs, sheets and schedules rebuilt per building
Campus replication: fix the prototype once, then rebuild IDs, sheets and schedules for every building.
  1. Model the prototype

    Building 1 is modeled once, with racks numbered by hall, row and position, for example DH1-A-01.

    once
  2. Copy to each building

    The tool copies it to buildings 2 to 7, sets each one's shared coordinates and adds a building prefix to every ID: B2-DH1-A-01, B3-DH1-A-01 and so on.

    per building
  3. Build the sheets

    Views, sheets, tags and schedules for every hall in every building, from one sheet list and one naming rule.

    from one sheet list
  4. Push changes

    When a row moves or a rack type changes in the prototype, the change goes to every copy, and a report lists what differs building by building.

    every revision

Try the sheet list demo  ·  More on campus automation

Scale and power

Gigawatt projects put a lot of power equipment in the model.

Projects like the one planned in Paducah pair the data center with its own generation and batteries. More switchgear, transformers, UPS and distribution means more upstream IDs and more A/B paths to keep in line with the one-line diagram.

New generation is years out

When power arrives in phases over several years, the model has to show which racks, feeds and cooling belong to which phase, and how much load each phase carries.

What fits

  • Power path checks that compare your one-line equipment list with the model, and flag racks missing an A or B source
  • Load roll-ups per building, hall and phase, compared with the capacity you enter
  • Owner-standard checks across many models, run nightly in the cloud with Autodesk Platform Services (APS)

Some APS usage is metered and billed by Autodesk to your account. We estimate usage before we build.

Try the A/B feed check demo

Power chain with A and B pathsOne-line style diagram. Two independent paths, A and B, each run from utility through medium-voltage switchgear, transformer, UPS, PDU and RPP or busway to the same dual-corded rack.UtilityUTIL-AMV switchgearMVS-ATransformerTX-AUPSUPS-APDUPDU-ARPP / buswayRPP-APATH AUtilityUTIL-BMV switchgearMVS-BTransformerTX-BUPSUPS-BPDUPDU-BRPP / buswayRPP-BPATH BRackDH1-A-03Simplified. Real designs add generators, ATS/STS, redundancy and protection your electrical engineer specifies.
A and B power paths, simplified. A power path check confirms that every rack points to the right upstream equipment on both paths. Redundancy design stays with your electrical engineer.
Across the state

Proposals from 25 MW to more than 1 GW.

Beyond Louisville and Paducah, proposals are spread across the state, from eastern Kentucky to the Ohio River counties. They are proposals, not projects under construction, and some face local moratoria.

As reported on the Kentucky Lantern statewide map, updated August 2026. Proposals change, and some never get built. Listed for context only. We have no involvement in them.
LocationProposal as reportedStatus
Mason County1.2 GW, by an undisclosed "Fortune 100" companyProposal
Barren County1.2 GWProposal
Mercer CountyUp to 1.3 GW (Panattoni)Proposal
Boyd and Greenup counties (Ashland area)Up to 1 GW (TeraWulf)Proposal
Hancock County482 MW (TeraWulf)Proposal
Carroll County$9.6B (Poe and PowerHouse)Proposal
Pike County25–30 MWProposal
LexingtonDartPoints expansionBlocked by a moratorium
Bell and Fayette counties–Moratoria in place
Oldham County–Proposal withdrawn

Small sites need a fast, repeatable start

A 25–30 MW project doesn't justify weeks of template and family setup. A ready data center Revit kit with shared parameters, filters and schedules lets a small team start the model on day one.

Large sites need replication and checks

A 1 GW campus repeats buildings and halls many times. Campus copy tools, sheets per hall and owner-standard checks keep every building consistent.

Policy context

Incentives are set. Rules may still change.

HB 775 tax exemption

HB 775 (2025) extended the sales and use tax exemption for data centers statewide, for up to 50 years. The minimum investment drops to $25M in counties under 50,000 people, so smaller sites outside the big metros can qualify as well as gigawatt campuses.

Source: Stites & Harbison

Guardrails may return in 2027

Proposed data center guardrails (HB 593, then language added to SB 197) were stripped at the end of the 2026 legislative session. They may come back in 2027.

Source: WKYU, Apr 15, 2026

What this means for your tools: when rules may change mid-project, build checks on rules you can edit. We build tools that read their limits and naming rules from a settings table your team controls, so a new owner requirement or a new local rule is a settings change, not a rebuild. The rules and values themselves come from your engineer of record and your consultants.

Prefab for a limited labor pool

More work in the shop, fewer hands on site.

The Paducah project alone is expected to bring about 8,000 construction jobs. Nationally, Associated Builders and Contractors (ABC) estimates the industry needs 349,000 net new construction workers in 2026 and names data center demand for electricians as a driver (EC&M).

Prefab is one answer contractors use. DPR Construction reports prefabricating 25 electrical rooms on 2 MW skids, saving just under 15,000 onsite electrician hours, about $1.8M (DPR). Every one of those skids still needs sheets, numbers and a bill of materials.

What fits

  • Spool and assembly sheets with views, dimensions and numbering
  • Bill of materials and cut-list export for the shop
  • Weight and QR code table per skid or module
  • Status parameters: designed, released, fabricated, installed

Pilot $750–$1,500. Builds $4,000–$15,000. Prefab details

About weights: weights come from the model and are for estimating and logistics only, not for rigging or lift plans.

Services that fit

Where we recommend starting on a Kentucky project.

Every job has a price agreed in writing before work begins, in US dollars. Prices exclude any applicable taxes.

Your situationWhat fitsStarting priceEstimated time
Several buildings from one designCampus copy and sheets-per-building tool as a custom C# add-in$4,000–$15,0002–8 weeks
Lots of power equipment and A/B pathsPower path check, as a Dynamo or pyRevit pilot$750–$1,5001–2 weeks
A new team starting a data center modelData center Revit kit: families, shared parameters and template$2,500–$6,0002–4 weeks
Models from several firms on one campusModel health check against the owner's standard$500 per model3 business days after access
Prefab skids and spoolsPrefab and spool automation$750–$1,500 pilot1–2 weeks
Turnover to the operatorHandover package: COBie checks, Autodesk Tandem mapping, DCIM import files$2,500–$6,000Set in your scope
Support across a multi-year campusMonthly automation retainer$2,000–$4,000/moMonth to month

Our tools apply rules and values that your engineer of record provides. Their outputs are drafting and data aids, not engineering calculations, code-compliance reviews or sealed documents. Your licensed professionals review the results and remain responsible for the design.

Working remotely

How we work with Kentucky teams.

Whether your team works out of Louisville, Lexington or a site office in western Kentucky, the way we work is the same:

  • Written replies within one US business day
  • Live calls scheduled within US business hours by arrangement, on Teams, Zoom or Google Meet
  • A short demo every week while we build
  • One point of contact: the person writing your code
  • An NDA before any file changes hands: yours, after a quick review, or our mutual one

How we work, step by step

Where is your team?

SS Technologies is a remote company. Before any file changes hands, we confirm in writing our registered entity and where your data would be accessed from, so you can check it against your contract (for example, US-persons-only access, background checks or CUI). If your project restricts who can see files, tell us on the scoping call.

Security, NDA and IP details

FAQ

Questions Kentucky teams usually ask

Do you have an office in Kentucky?

No. SS Technologies is a remote company. We serve Kentucky teams remotely, with written replies within one US business day and live calls scheduled within US business hours by arrangement.

Have you worked on the Louisville or Paducah projects?

No. They're public examples of data center work in Kentucky, listed with their sources. We never name a client's company or project without written permission.

Our buildings aren't identical. Does campus replication still help?

It can, if they share a core design. The tool copies what's shared and keeps a list of what's different per building, such as orientation, levels or utility connections. On the scoping call we look at how much really repeats before recommending it.

Do you do electrical design or generator sizing?

No. Our tools apply rules and values that your engineer of record provides. They check that the model matches the one-line and the rules you set. Their outputs are drafting and data aids, not engineering calculations, code-compliance reviews or sealed documents. Your licensed professionals review the results and remain responsible for the design.

What's the smallest way to start?

A $500 model health check, or a fixed-price pilot of $750–$1,500 with a written acceptance test. If the pilot doesn't pass the written acceptance test on the agreed Revit version, we fix it at no charge. If it still doesn't pass within 10 business days of your test report, we refund the pilot fee in full. This doesn't cover changes to the scope, the test model or the Revit version after the scope is signed.

Other markets: California  ·  All markets we serve

Free 30-minute scoping call

Building on a Kentucky campus? Let's find the work that repeats.

Show us one task your team does in every building or every hall. Within 2 business days of the call you get a written scope with a fixed price for a pilot or first phase, and an estimate range for anything bigger.